Projects name: The canal system belongs to Plei Keo irrigation project
Location: Ayun Commune, Chư Sê District, Gia Lai Province
General introduction:
Pleikeo irrigation work (Ayun commune, Chu Se district, Gia Lai province) with a total value of more than 119 billion VND, invested by the People's Committee of Chu Se district has just been completed in 2019. It is expected that, when put into operation, Pleikeo Irrigation will provide self-flowing irrigation water for about 400ha of 2-crop rice and create a source of irrigation for 100ha of crops of people in 10 villages of Ayun commune, helping to ensure food supply locally, contributing to hunger eradication, poverty reduction and local socio-economic development.
List of works:
+ Inspection of concrete quality on site by sample drilling method.
+ Verification of concrete strength by non-destructive method.
+ Inspection the soil tighness of the canal works and the works on the canal.
+ Inspection of reinforcement in concrete.
Images of inspection equipment:
Concrete Core Drilling
|
Compression Machine
|
Rebar Locator
|
Concrete Test Hammer
|
Tools for creating flat concrete cylinder samples
|
The vernier caliper showing the reading number 0.01mm
|
Sand Hopper
|
Ring knife soil sampling cutting tool
|
Technical scales
|
Standard Compacting tool
|
Images of project implemention:
Check the tightness at the main canal
|
Check the tightness at the main canal
|
Check the tightness at the N2 canal
|
Check the tightness at the N1 canal
|
Collect concrete samples on site
|
Collect concrete samples on site
|
Collect concrete samples on site
|
Symbol the on-site drilling samples
|
Check the concrete strength
|
Check the concrete strength of steel pipe column
|
Check the concrete protection coatings thickness and the diameter of the reinforcement
|
Check the concrete strength of the canal edge
|
Check the concrete protection coatings thickness, the diameter of the reinforcement column No.3
|
Check the concrete protection coatings thickness, the diameter of the reinforcement of canal edge
|
Check the concrete strength of the columns
|
Check the concrete strength of concrete slabs
|
Check the concrete protection coatings thickness, the reinforcement’s diameter of the gate
|
Check the concrete protection coatings thickness, the reinforcement’s diameter of steel pipe columns No.7
|
Check the concrete strength of steel pipe columns No.7
|
Check the concrete strength of the canal regulating gate
|
Sample preparation
|
Compression testing of on-site samples
|
Results of compressing on-site concrete samples
|
Results of compressing on-site concrete samples
|